Used Self Erect Cranes Hawaii - Usually the base which is bolted into a huge concrete pad provides the necessary support for a tower crane. The base is attached to a mast or a tower and stabilizes the crane that is attached to the inside of the building's structure. Normally, this attachment point is to an elevator shaft or to a concrete lift.
Usually, the mast is a triangulated lattice structure measuring 0.9m2 or 10 feet square. The slewing unit is attached to the very top of the mast. The slewing unit is made of a motor and a gear which enable the crane to rotate.
Tower cranes may have a max unsupported height of eighty meters or two hundred sixty five feet, while the tower crane's maximum lifting capacity is 16,642 kilograms or 39,690 lbs. with counter weights of 20 tons. Moreover, two limit switches are utilized to be able to ensure the driver does not overload the crane. There is also another safety feature known as a load moment switch to ensure that the operator does not exceed the ton meter load rating. Last of all, the maximum reach of a tower crane is seventy meters or 230 feet.
There is definitely a science involved with erecting a tower crane, particularly due to their extreme heights. At first, the stationary structure has to be brought to the construction location by using a huge tractor-trailer rig setup. Then, a mobile crane is utilized in order to assemble the equipment part of the jib and the crane. These sections are then connected to the mast. After that, the mobile crane adds counterweights. Forklifts and crawler cranes may be some of the other industrial machines that is utilized to erect a crane.
Mast extensions are added to the crane as the building is erected. This is how the height of the crane could match the building's height. The crane crew uses what is referred to as a climbing frame or a top climber that fits between the slewing unit and the top of the mast. A weight is hung on the jib by the work crew in order to balance the counterweight. When complete, the slewing unit can detach from the top of the mast. In the top climber, hydraulic rams are used to adjust the slewing unit up an additional 20 feet or 6.1m. Then, the crane driver uses the crane to insert and bolt into position another mast section piece.